LIKELIHOOD

Almost Certain 5
Likely 4
Possible 3
Rare 2
Unlikely 1
Moderate (5)
High (10)
High (15)
Critcal (20)
Critcal (25)
Moderate (4)
Moderate (8)
High (12)
Critcal (16)
Critcal (20)
Low (3)
Moderate (6)
High (9)
High (12)
High (15)
Low (2)
Moderate (4)
Moderate (6)
Moderate (8)
High (10)
Low (1)
Low (2)
Low (3)
Moderate (4)
Moderate (5)
1Insignificant 2Minor 3Significant 4Severe 5Catastrophic

IMPACT

Risk Score = (Likelihood x Impact)
Low (1,2,3)
Moderate (4,5,6,7,8)
High (9,10,11,12,13,14,15)
Critical (16,17,18,19,20,21,22,23,24,25)
Manage and monitor at the project manager level
Actively manage / monitor at the Sector Head and Project Steering Committee
Requires an appropriate treatment and response at the Project Steering Committee, and Executive Management and Risk Committee (EMRC) level with progress reporting to the Secretary General
Potential to become an Extreme Risk, therefore requiring immediate action by the Executive with some planning, allocation of resources and monitoring
Likelihood Qualitative Measures Frequency Measures
Almost Certain (5) Event will occur in most circumstances Expected in next 3 months / occurred in last 3 months
Likely (4) Event will probably occur in most circumstances Expected in next 6 months / occurred in last 6 months
Possible (3) Event should occur in some circumstances Expected in next 12 months / occurred in last 12 months
Rare (2) Event could occur in some circumstances Expected in next 36 months / occurred in last 36 months
Unlikely (1) Event may occur in some exceptional circumstances Not expected in next 36+ months / not occurred in last 36+ months
Likelihood Qualitative Measures
Insignificant (1) Little or no impact on achieving outcome objects
Minor (2) Minor impact on achieving desired results to the extent that one or more stated outcome objectives will fall below goals but well above minimum acceptable levels
Medium (3) Moderate impact on achieving desired results to the extent that one or more stated outcome objectives will fall well below goals but above minimum acceptable levels
Significant (4) Significant impact on achieving desired results to the extent that one or more stated outcome objectives will fall below acceptable levels
Catastrophic (5) Severe impact on achieving desired results to the extent that one or more of its critical outcome objectives will not be achieved
Strategic and Reputation
  • Limited impact - some local media / political attention. Effect will last a few days only
Financial
  • SAR up to 50,000
Operational
  • Loss of operations capacity for up to 1 hour
Health & Safety
  • Near miss HSE incidents
Technology
  • Loss of systems, network, database access and technology infrastructure for less than an hour
  • Near miss data breach, cyber/information security issue
Compliance (Legal/ Regulatory/ Contractual)
  • Single exceedance of statutory or internally prescribed limits
  • No regulator or government concern
  • Clarifying statements and excessive communications to satisfy
Environment
  • Temporary nuisance from noise, odour, dust, other air emissions, greenhouse gases, vibration, visual impact
  • Minor use of water, fuels and energy and other natural resources
  • Generation of significant quantities of non-hazardous waste
Strategic and Reputation
  • Limited impact - some local media / political attention. Effect will last a few days only
Financial
  • SAR up to 50,000
Operational
  • Loss of operations capacity for up to 1 hour
Health & Safety
  • Near miss HSE incidents
Technology
  • Loss of systems, network, database access and technology infrastructure for less than an hour
  • Near miss data breach, cyber/information security issue
Compliance (Legal/ Regulatory/ Contractual)
  • Single exceedance of statutory or internally prescribed limits
  • No regulator or government concern
  • Clarifying statements and excessive communications to satisfy
Environment
  • Temporary nuisance from noise, odour, dust, other air emissions, greenhouse gases, vibration, visual impact
  • Minor use of water, fuels and energy and other natural resources
  • Generation of significant quantities of non-hazardous waste
Strategic and Reputation
  • Limited impact - some local media / political attention. Effect will last a few days only
Financial
  • SAR up to 50,000
Operational
  • Loss of operations capacity for up to 1 hour
Health & Safety
  • Near miss HSE incidents
Technology
  • Loss of systems, network, database access and technology infrastructure for less than an hour
  • Near miss data breach, cyber/information security issue
Compliance (Legal/ Regulatory/ Contractual)
  • Single exceedance of statutory or internally prescribed limits
  • No regulator or government concern
  • Clarifying statements and excessive communications to satisfy
Environment
  • Temporary nuisance from noise, odour, dust, other air emissions, greenhouse gases, vibration, visual impact
  • Minor use of water, fuels and energy and other natural resources
  • Generation of significant quantities of non-hazardous waste
×
Quarter
Q1 Q2 Q3 Q4
Is Auditor
Deesignation
Developer Designer
Sub Section
Interview
5